Arbayan project

The deposits in the region have been systematically studied since 1936, however, the Arbayan deposit, along with other rare metal occurrences was only discovered during prospecting from 1977 to 1980. Exploration work was curtailed on the deposit until 2009 when OUG completed 13 surface diamond drill holes.

Following the completion of the 2009 drilling program, RPM (Runge Pincock Minarco Limited) was engaged by the Company to review the project and plan a substantial drilling program to define and upgrade the resource. During the drilling of this program, which was completed in 2010, RPM recommended and oversaw all site drilling and sampling procedures to ensure that the highest international standards were being followed.
RPM has independently estimated the Mineral Resources contained within the Arbayan deposit. The data, upon which the Mineral Resource estimate is based, was collected from the Clients own team and includes data up to April 2016. The Mineral Resource estimate, and underlying data, comply with the recommendations of the Australasian Code for Reporting of Mineral Resources and Ore Reserves prepared in 2012 by the Joint Ore Reserves Committee (JORC); as such, the Statement of Mineral Resources is considered to be suitable for public reporting.

 

From the site 

DSC07278
Central-lithium-pic-1
Screenshot 2022-07-29 104937
DSC07106
DSC04110
Screenshot 2022-07-29 151459



Screenshot 2022-07-29 090801
1+
Meters of Drilling
1+
Tons of Li2O 
1+
Tons of WO3
1+
Rb

our products

Li
Lithium Carbonate


Tu
Tungsten Concentrate


Project stakeholders 



1623194537545
Lepidico  LiCO3 Test work